Hengs and Unitech launch 5.04MW/10.03MWh behind-the-meter energy storage project
Sustainable energy firm Hengs Technology partnered with PCB maker Unitech Printed Circuit Board on a 5.04MW/10.03MWh behind-the-meter energy storage project at Unitech's Yi... (site in Yilan, per report).
Read the full story at DigiTimes Asia ↗
Timeline · 1 report
- 2026-11-14 17:59 · DigiTimes Asia
Hengs, Unitech launch 5.04MW/10.03MWh energy storage project